Highway No. 220 Construction Project
Highway No. 220 Construction Project,
Wang Hin District – Khukhan District, Section 1
The project involved construction on Highway No. 220, between Km. 22+000.000 and Km. 35+000.000, covering approximately 13.000 kilometers.
Contract No.: ST.2/5/2023
Project Duration: March 1, 2023 – March 3, 2025
(Note: Approval was granted to waive or reduce penalties due to the festival holidays from March 4, 2025 to March 31, 2025; however, the project was required to be completed by March 3, 2025.)
Project Value: 519,468,135.58 Baht
Contracting Authority: Department of Highways, Ministry of Transport
Project Location: Sisaket Province
(Project Coordinates: 14°53’12.2″N, 104°11’30.4″E)